skip to Main Content
Operations
Environmental Permitting
Environmental & Permitting
Gathering Systems
Gathering Systems
Reports
Reports

GELLC’s operating philosophy places the highest priority on the safety of our employees and protection of the environment.  The natural beauty, water and wildlife resources in the North Fork Valley area of Colorado demand that GELLC adhere to the highest levels of environmental stewardship in all facets of our operations.  This is accomplished by strict compliance with regulatory rules and requirements, working closely with Gunnison and Delta counties, the Forest Service, Bureau of Land Management, citizen groups and others to identify potential impacts from our work and to address these impacts with the most current best management practices and technologies.

GELLC has constructed four gathering systems, three compressor and treating stations and significant water handling infrastructure.  These systems were designed to mitigate impacts from our operations.   For example, GELLC utilizes non-potable water produced by “coalseam gas” wells to drill and complete new gas wells.  This means little or no fresh water resources are consumed by GELLC.  In addition, GELLC has installed below ground water pipelines which allow water to be pumped to and from well locations so that traffic, dust and noise are minimized.  This thoughtful approach to our operations means that future impacts from additional well drilling and operations will be minimized.

Regional Map
Ragged Mountain

The Ragged Mountain Gathering System and Compressor Station gathers, treats and compresses gas from GELLC’s project area and currently delivers it into the Rocky Mountain Natural Gas Pipeline, an intrastate pipeline.  It is anticipated that the Ragged Mountain Gathering System will be interconnected to the Bull Mountain system.

The Ragged Mountain Gathering System is a common carrier and a Statement of Operating Conditions governing use of the system by third parties is available below.

Notices – pdf download

Statement of Operating Conditions – pdf download

Summary of Rates – pdf download

Gathering System Map – pdf download

Divide Creek Gathering System

The Divide Creek Gathering System and associated Divide Creek Compressor Station is designed to gather, treat and deliver gas from GELLC’s project area north to a delivery point on Questar’s pipeline system.  This gathering system is a large capacity system with access to interstate markets.

The Divide Creek Gathering System is a common carrier and a Statement of Operating Conditions governing use of the system by third parties is available below.

Statement of Operating Conditions – pdf download

Rate Summary – pdf download

Gathering System Map – pdf download

Hotchkiss Gathering System

The Hotchkiss Gathering System is connected to the Sheep Gas Gathering System. It does not include treatment and compression facilities.

The Hotchkiss Gathering System is not a common carrier system.

Gathering System Map – pdf download

Sheep Gas Gathering System

The Sheep Gas Gathering System gathers gas for delivery into either the Ragged Mountain Gathering System or Bull Mountain system. This gathering system does not include treating or compression facilities.

The Sheep Gas Gathering System is a common carrier and a Statement of Operating Conditions governing use of the system by third parties is available below.

Gathering System Map – pdf download

Back To Top